- Date
- 06/11/2021
- W/O
- 0887845
- Weather
- Dry
- Operator/Surveyor
- MARTIN
- Sewer ID
- Z00633
- PipeID
- P11988
- Time
- 1:32 AM
- Certificate
- U-1014-06022543
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Heavy Cleaning
- Media Label
- H1842
- Sewer Name
- 15 TURNBULL CANYON TRUNK
- City
- INDUSTRY
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 15
- Page No.
- 35
- Purpose
- Routine Assessment
- Project
- 20210611MDM_TURBULL_CANYON_TRUNK
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 18 in.
- Upstream MH
- 15 0051
- Downstream MH
- H 0868
- Dir. of Survey
- Upstream
- Length Surveyed
- 59.9 ft.
- Total Length
- 59.9 ft.
- Structural Index
- 2
- Structural Quick
- 322B
- Structural Rating
- 34
- O&M Index
- 2
- O&M Quick
- 2100
- O&M Rating
- 2
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 36
Pipe schematic from manhole 15 0051 to H 0868 Observation photos (6)

8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO

12.4 ft. - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES, Start - HAIRLNE

12.4 ft. - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES, Start - HAIRLINE

25.8 ft. - General Photograph - POSSIBLE OLD PIPE COATING OM PIPE

59.4 ft. - Fracture Circumferential, from 07 to 09 o'clock, within 8 inches of joint: YES - MODERATE

59.9 ft. - Upstream Manhole, Survey Ends - 2:15AM(STOPLOG IN PLACE)