Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 21, 2021, 06:13 AM
  • H 0557_H 0556_05202021_232506.mp4

Date
05/20/2021
W/O
890859
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00186
PipeID
P10981
Time
11:13 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8921
Sewer Name
H JOINT OUTFALL H - UNIT 8C
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
WO_890859_TV15170_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 0557
Downstream MH
H 0556
Dir. of Survey
Downstream
Length Surveyed
229.2 ft.
Total Length
229.2 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
132
O&M Index
2
O&M Quick
2H00
O&M Rating
90
Overall Index
2
Overall Quick
Overall Rating
222
Pipe schematic from manhole H 0557 to H 0556
MH: H 0557MH: H 0556downstream0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - H 05572 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start6 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start78.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"85.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"158.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"182.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"214.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"227.3 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish227.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish229.2 ft. AMH - Downstream Manhole, Survey Ends - H 0556229.2 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
214.8TFC
78.4TFA
182.7TFC
158.5TFA
2MGOMAG COATING THROUGHOUT
0MWM
0MGOCOCKROACHES IN MANHOLE
2DAGS
229.2AMHH 0556
85.7TFC
0MWL
229.2MGOCOCKROACHES IN MANHOLE
227.3SAV
227.3DAGS
0MGOCONNECTION AT MH 9 O'CLOCK
6SAV
0AMHH 0557

Properties (7)

additional_info
630069052021201
custom_field_three
VISIBLE AGGREGATE
custom_field_two
3
customer
1
datetime
2021-05-20T23:13:34-07:00
documentation
PRO PIPE
is_lateral_inspection
false