Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 17, 2021, 08:39 AM
  • 21 0395_21 0394_05172021_024338.mp4

Date
05/17/2021
W/O
891471
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00757
PipeID
P15601
Time
1:39 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8958
Sewer Name
21 CENTER STREET TRUNK
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
35
Purpose
Routine Assessment
Project
WO_891471_TV21124_MAY2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
21 0395
Downstream MH
21 0394
Dir. of Survey
Downstream
Length Surveyed
354.2 ft.
Total Length
354.2 ft.
Structural Index
3
Structural Quick
433I
Structural Rating
168
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
168
Pipe schematic from manhole 21 0395 to 21 0394
MH: 21 0395MH: 21 0394downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 21 03950 ft. MWL - Water Level, 10 %of cross sectional area11.6 ft. FM - Fracture Multiple, from 07 to 11 o'clock, within 8 inches of joint: YES83.7 ft. CM - Crack Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES84.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"101.3 ft. CM - Crack Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES106.1 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start232.5 ft. FM - Fracture Multiple, from 06 to 08 o'clock, within 8 inches of joint: YES263.1 ft. FM - Fracture Multiple, from 01 to 05 o'clock, within 8 inches of joint: YES325.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"354.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish354.2 ft. AMH - Downstream Manhole, Survey Ends - 21 0394

Observation photos (6)

  • Fracture Multiple, from 07 to 11 o'clock, within 8 inches of joint: YES

    11.6 ft. - Fracture Multiple, from 07 to 11 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES

    83.7 ft. - Crack Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES

    101.3 ft. - Crack Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    106.1 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 06 to 08 o'clock, within 8 inches of joint: YES

    232.5 ft. - Fracture Multiple, from 06 to 08 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 01 to 05 o'clock, within 8 inches of joint: YES

    263.1 ft. - Fracture Multiple, from 01 to 05 o'clock, within 8 inches of joint: YES

Observations (13)

DistanceCodeObservation
83.7CM
325.4TFC
263.1FM
354.2CM
106.1CM
354.2AMH21 0394
0MWM
101.3CM
0AMH21 0395
0MWL
232.5FM
11.6FM
84.8TFC

Properties (6)

custom_field_three
CRACKS, FRACTURES
custom_field_two
3
customer
1
datetime
2021-05-17T01:39:15-07:00
documentation
PRO PIPE
is_lateral_inspection
false