Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 19, 2021, 10:14 AM
  • H 0440_H 0439_05192021_032729.mp4

Date
05/19/2021
W/O
890833
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00180
PipeID
P10895
Time
3:14 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8917
Sewer Name
H JOINT OUTFALL H - UNIT 5D
City
SOUTH EL MONTE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
RFIR_WO_890833_TV15196_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 0440
Downstream MH
H 0439
Dir. of Survey
Downstream
Length Surveyed
437.1 ft.
Total Length
437.1 ft.
Structural Index
2
Structural Quick
3L2P
Structural Rating
366
O&M Index
2
O&M Quick
2P00
O&M Rating
174
Overall Index
2
Overall Quick
Overall Rating
540
Pipe schematic from manhole H 0440 to H 0439
MH: H 0440MH: H 0439downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 04400 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start15.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start26 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6"103.6 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start119.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"147.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"308.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"378.4 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"388.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"435 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish435 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish435 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish437.1 ft. AMH - Downstream Manhole, Survey Ends - H 0439437.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (4)

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    15.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    103.6 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
435SAV
0MWM
26TF
0AMHH 0440
0MWL
2MGOMAG COATING THROUGHOUT
388.8TFA
435SSS
103.6SAV
147.7TFC
435DAGS
378.4TBA
2DAGS
437.1AMHH 0439
437.1MGOCONNECTION AT MH 9 O'CLOCK
15.1SSS
308.6TFA
119.3TFA

Properties (7)

additional_info
630069051921002
custom_field_three
SPALLING/VISIBLE AGGREGATE
custom_field_two
3
customer
1
datetime
2021-05-19T03:14:50-07:00
documentation
PRO PIPE
is_lateral_inspection
false