Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 20, 2021, 09:35 AM
  • H 1195_H 0580_05202021_024605.mp4

Date
05/20/2021
W/O
891208
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00188
PipeID
P21382
Time
2:35 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8920
Sewer Name
H JOINT OUTFALL H - UNIT 8E
City
BALDWIN PARK
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_891208_TV15172_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 1195
Downstream MH
H 0580
Dir. of Survey
Downstream
Length Surveyed
198.9 ft.
Total Length
198.9 ft.
Structural Index
3
Structural Quick
5F3G
Structural Rating
380
O&M Index
2
O&M Quick
412G
O&M Rating
82
Overall Index
3
Overall Quick
Overall Rating
462
Pipe schematic from manhole H 1195 to H 0580
MH: H 1195MH: H 0580downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 4 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - H 11952 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start9.8 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start196.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish196.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish196.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish196.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish198.9 ft. AMH - Downstream Manhole, Survey Ends - H 0580, RUN LIST STATES MH AT 351'.198.9 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK198.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    9.8 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    198.9 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (15)

DistanceCodeObservation
196.2SAP
196.2SRV
0MWL
198.9AMHH 0580, RUN LIST STATES MH AT 351'.
196.2DAGS
2SAP
9.8SRV
198.9MGOCONNECTION AT MH 3 O'CLOCK
198.9MGOCOCKROACHES IN MANHOLE
196.2SSS
2SSS
2DAGS
0MWM
0MGOCONNECTION AT MH 4 O'CLOCK
0AMHH 1195

Properties (7)

additional_info
630069051921203
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-05-20T02:35:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false