Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 20, 2021, 09:46 AM
  • H 0580_H 0579_05202021_025655.mp4

Date
05/20/2021
W/O
891208
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00188
PipeID
P11004
Time
2:46 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8920
Sewer Name
H JOINT OUTFALL H - UNIT 8E
City
BALDWIN PARK
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_891208_TV15172_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 0580
Downstream MH
H 0579
Dir. of Survey
Downstream
Length Surveyed
275.5 ft.
Total Length
275.5 ft.
Structural Index
2
Structural Quick
3I2J
Structural Rating
264
O&M Index
2
O&M Quick
412J
O&M Rating
114
Overall Index
2
Overall Quick
Overall Rating
378
Pipe schematic from manhole H 0580 to H 0579
MH: H 0580MH: H 0579downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 05800 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start8.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start55.1 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"170.8 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"219.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"270 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish272.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish272.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish275.5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK275.5 ft. AMH - Downstream Manhole, Survey Ends - H 0579275.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    8.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    275.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
270SAP
2SSS
275.5MGOCONNECTION AT MH 3 O'CLOCK
8.3SAP
219.8TFC
0AMHH 0580
272.1DAGS
2DAGS
0MGOCONNECTION AT MH 3 O'CLOCK
0MGOCOCKROACHES IN MANHOLE
272.1SSS
0MWL
275.5AMHH 0579
275.5MGOCOCKROACHES IN MANHOLE
0MWM
55.1TBC
170.8TBA

Properties (7)

additional_info
630069051921203
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-05-20T02:46:35-07:00
documentation
PRO PIPE
is_lateral_inspection
false