Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 19, 2021, 11:09 AM
  • 18 0352_18 0228_05192021_041404.mp4

Date
05/19/2021
W/O
891129
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00714
PipeID
P14186
Time
4:09 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8870
Sewer Name
18 WASHINGTON BOULEVARD TRUNK
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_891129_TV18179_MAY2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0352
Downstream MH
18 0228
Dir. of Survey
Downstream
Length Surveyed
146.5 ft.
Total Length
146.5 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 18 0352 to 18 0228
MH: 18 0352MH: 18 0228downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 03520 ft. MWL - Water Level, 10 %of cross sectional area3.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start50.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"98.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"146.5 ft. AMH - Downstream Manhole, Survey Ends - 18 0228146.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
0MWM
0AMH18 0352
3.8CM
146.5AMH18 0228
98.4TFC
0MWL
50.6TFC
146.5CM

Properties (7)

additional_info
630138051821202
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-05-19T04:09:02-07:00
documentation
PROPIPE
is_lateral_inspection
false