Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 27, 2021, 09:35 AM
  • 18 0914_18 0913_05272021_025147.mp4

Date
05/27/2021
W/O
890877
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00709
PipeID
P14765
Time
2:35 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8928
Sewer Name
18 SO WHITTIER OUTFALL RLF TR, SECTS 1,2A,2B,2C,&3
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
WO_890877_TV18049_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
18 0914
Downstream MH
18 0913
Dir. of Survey
Downstream
Length Surveyed
422.4 ft.
Total Length
422.4 ft.
Structural Index
3
Structural Quick
3P2O
Structural Rating
416
O&M Index
2
O&M Quick
2P00
O&M Rating
168
Overall Index
2
Overall Quick
Overall Rating
584
Pipe schematic from manhole 18 0914 to 18 0913
MH: 18 0914MH: 18 0913downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 09140 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start9.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start421.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish421.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish421.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish422.4 ft. AMH - Downstream Manhole, Survey Ends - 18 0913422.4 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    9.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    422.4 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (12)

DistanceCodeObservation
421.4SSS
2DAGS
0MWL
0AMH18 0914
0MWM
9.2SSS
422.4AMH18 0913
421.4SAP
422.4MGOCOCKROACHES IN MANHOLE
2SAP
0MGOCOCKROACHES IN MANHOLE
421.4DAGS

Properties (7)

additional_info
630069052621201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-05-27T02:35:17-07:00
documentation
PRO PIPE
is_lateral_inspection
false