Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 24, 2021, 08:06 AM
  • H 0188_H 0187_05242021_013307.mp4

Date
05/24/2021
W/O
890943
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00168
PipeID
P10635
Time
1:06 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8923
Sewer Name
H JOINT OUTFALL H - UNIT 2B
City
BELL GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_890943_TV02360_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 0188
Downstream MH
H 0187
Dir. of Survey
Downstream
Length Surveyed
467.9 ft.
Total Length
467.9 ft.
Structural Index
3
Structural Quick
3Q2M
Structural Rating
409
O&M Index
2
O&M Quick
2Q00
O&M Rating
184
Overall Index
2
Overall Quick
Overall Rating
593
Pipe schematic from manhole H 0188 to H 0187
MH: H 0188MH: H 0187downstream0 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - H 01880 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start10.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start34.2 ft. MGO - General Observation - MAG COATING THROUGHOUT123.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start463.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish463.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish463.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish467.9 ft. AMH - Downstream Manhole, Survey Ends - H 0187

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10.7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    34.2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    123.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
0MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
463.7DAGS
0AMHH 0188
463.7SAP
463.7SSS
467.9AMHH 0187
0MWL
2DAGS
10.7SAP
0MWM
34.2MGOMAG COATING THROUGHOUT
123.4SSS

Properties (7)

additional_info
630069052421001
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-05-24T01:06:52-07:00
documentation
PRO PIPE
is_lateral_inspection
false