Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 19, 2021, 08:32 AM
  • 18 0357_18 0356A_05192021_014211.mp4

Date
05/19/2021
W/O
890902
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00714
PipeID
P26488
Time
1:32 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8869
Sewer Name
18 WASHINGTON BOULEVARD TRUNK
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
09
Purpose
Routine Assessment
Project
WO_890902_TV18060_MAY2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0357
Downstream MH
18 0356A
Dir. of Survey
Downstream
Length Surveyed
322.9 ft.
Total Length
322.9 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
320
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
448
Pipe schematic from manhole 18 0357 to 18 0356A
MH: 18 0357MH: 18 0356Adownstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 03570 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start50.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"99 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"146.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"200 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"247.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"295.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"320 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish320 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish322.9 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE322.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish322.9 ft. AMH - Downstream Manhole, Survey Ends - 18 0356A

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
295.9TFC
0MGOCONN @ MH 9 O'CLOCK/CAPPED
146.7TFC
200TFC
322.9MGOCONN @ MH 9 O'CLOCK/ACTIVE
320SSS
0MGOCONN @ MH 3 O'CLOCK/CAPPED
99TFC
247.8TFC
322.9CM
0MGOROACHES @ MH
320DAGS
2DAGS
0MWL
0AMH18 0357
322.9AMH18 0356A
2CM
0MWM
2SSS
50.5TFC

Properties (8)

additional_info
630138051821201
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-05-19T01:32:18-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
40739