Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 19, 2021, 07:16 AM
  • 18 0360_18 0359_05192021_002444.mp4

Date
05/19/2021
W/O
890902
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00714
PipeID
P14194
Time
12:16 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8869
Sewer Name
18 WASHINGTON BOULEVARD TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
09
Purpose
Routine Assessment
Project
WO_890902_TV18060_MAY2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0360
Downstream MH
18 0359
Dir. of Survey
Downstream
Length Surveyed
194.9 ft.
Total Length
195 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
193
O&M Index
2
O&M Quick
412G
O&M Rating
80
Overall Index
2
Overall Quick
Overall Rating
273
Pipe schematic from manhole 18 0360 to 18 0359
MH: 18 0360MH: 18 0359downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 03600 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start22.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"70.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"192 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish192 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish194 ft. MGO - General Observation - ROACHES @ MH195 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish195 ft. AMH - Downstream Manhole, Survey Ends - 18 0359195 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED195 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
195CM
195AMH18 0359
22.8TFC
195MGOCONN @ MH 3 O'CLOCK/CAPPED
0MWM
0AMH18 0360
192DAGS
2CM
194MGOROACHES @ MH
2SSS
192SSS
2DAGS
0MWL
195MGOCONN @ MH 9 O'CLOCK/ACTIVE
70.7TFC
0MGOCONN @ MH 3 O'CLOCK/CAPPED

Properties (7)

additional_info
630138051821201
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-05-19T00:16:34-07:00
documentation
PROPIPE
is_lateral_inspection
false