Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 5, 2021, 08:47 AM
  • 18 0987_18 0117_05052021_020701.mp4

Date
05/05/2021
W/O
891398
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00698
PipeID
P13938
Time
1:47 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8859
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_891398_TV18083_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0987
Downstream MH
18 0117
Dir. of Survey
Downstream
Length Surveyed
173.7 ft.
Total Length
173.7 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
198
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
198
Pipe schematic from manhole 18 0987 to 18 0117
MH: 18 0987MH: 18 0117downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 09870 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK2.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start31.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"37.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"83.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"89.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"134.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"140.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"161.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"167.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"173.7 ft. AMH - Downstream Manhole, Survey Ends - 18 0117173.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish173.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    15.6 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
0MWL
173.7AMH18 0117
15.6CM
89.5TFC
173.7SAV
161.5TFC
2.6SAV
31.7TFC
0AMH18 0987
83.2TF
140.5TFC
134.5TF
0MWM
37.8TFC
0MGOCONNECTION AT THE MH 9 OC'LOCK
167.4TFC
173.7CM

Properties (7)

additional_info
630074050421201
custom_field_three
AGGREGATE VISIBLE/MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-05-05T01:47:49-07:00
documentation
PROPIPE
is_lateral_inspection
false