Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 5, 2021, 07:18 AM
  • 18 0115_18 0114_05052021_003112.mp4

Date
05/05/2021
W/O
891398
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00698
PipeID
P13935
Time
12:18 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8859
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_891398_TV18083_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0114
Downstream MH
18 0115
Dir. of Survey
Upstream
Length Surveyed
280.8 ft.
Total Length
280.8 ft.
Structural Index
3
Structural Quick
3U00
Structural Rating
333
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
333
Pipe schematic from manhole 18 0114 to 18 0115
MH: 18 0114MH: 18 0115upstream0 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 18 01150.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish31.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"38 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"79.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"86.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"132.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"138.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"180.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"187 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"233.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"238.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"273.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start278.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start280.8 ft. MWL - Water Level, 15 %of cross sectional area280.8 ft. AMH - Downstream Manhole, Survey Begins - 18 0114280.8 ft. MWM - Water Mark, 20 %of cross sectional area

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7.1 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0MWL
280.6SAV
0AMH18 0114
200.9TF
148.4TF
7.1CM
2.2SAV
194.4TF
249.4TFC
93.8TF
242.8TF
0MWM
280.8CM
47.2TFA
280.8AMH18 0115
99.9TFC
42.2TFC
142.1TF

Properties (7)

additional_info
630074050421201
custom_field_three
AGGREGATE VISIBLE/MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-05-05T00:18:44-07:00
documentation
PROPIPE
is_lateral_inspection
false