Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 10, 2021, 12:05 PM
  • 32 1001_32 1159_05102021_051808.mp4

Date
05/10/2021
W/O
890856
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00837
PipeID
P19613
Time
5:05 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8905
Sewer Name
32 DISTRICT #26 W.R.P. INFLUENT SEWER
City
SANTA CLARITA
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_890856_TV32045_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
32 1001
Downstream MH
32 1159
Dir. of Survey
Downstream
Length Surveyed
43.4 ft.
Total Length
43.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
5133
O&M Rating
30
Overall Index
3
Overall Quick
Overall Rating
30
Pipe schematic from manhole 32 1001 to 32 1159
MH: 32 1001MH: 32 1159downstream0 ft. MWM - Water Mark, 100 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 10010 ft. MWL - Water Level, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 12 to 12 o'clock, , within 8 inches of joint: YES, Start27 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIS41.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 12 to 12 o'clock, , within 8 inches of joint: YES, Finish41.8 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish43.4 ft. AMH - Downstream Manhole, Survey Ends - 32 115943.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observations (9)

DistanceCodeObservation
41.8DAGS
2DAGS
27DSZDEBRIS
43.4AMH32 1159
41.8DSZ
43.4MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MWM
0AMH32 1001
0MWL

Properties (7)

additional_info
630069051021002
custom_field_three
LIGHT GREASE
custom_field_two
4
customer
1
datetime
2021-05-10T05:05:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false