Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 13, 2021, 09:40 AM
  • 18 0282_18 0281_05132021_025531.mp4

Date
05/13/2021
W/O
891121
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00702
PipeID
P14110
Time
2:40 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8865
Sewer Name
18 SHOEMAKER AVENUE TRUNK
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_891121_TV18178_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0282
Downstream MH
18 0281
Dir. of Survey
Downstream
Length Surveyed
379.6 ft.
Total Length
379.6 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
375
O&M Index
2
O&M Quick
2N00
O&M Rating
150
Overall Index
2
Overall Quick
Overall Rating
525
Pipe schematic from manhole 18 0282 to 18 0281
MH: 18 0282MH: 18 0281downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 02822 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 60% MAG COAT3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"49.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"95.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"98.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"146.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"149.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"194.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"198 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"245.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"249 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"297.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"300.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"345.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"348.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN377 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish379.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish379.6 ft. AMH - Downstream Manhole, Survey Ends - 18 0281379.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (25)

DistanceCodeObservation
49.9TFC
146.7TFC
194.6TFC
379.6SSS
0MWL
98.4TFC
297.3TFC
149.5TFC
377DAGS
198TFC
348.6TFOPEN
0MWM
47.2TFC
379.6AMH18 0281
3SAV
245.8TFC
2DAGS
300.2TFC
379.6SAV
3SSS
2MGO60% MAG COAT
249TFC
95.5TFC
0AMH18 0282
345.4TFC

Properties (7)

additional_info
630138051221203
custom_field_three
AGGREGATE VISIBLE/SPALLING
custom_field_two
3
customer
1
datetime
2021-05-13T02:40:33-07:00
documentation
PROPIPE
is_lateral_inspection
false