Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 13, 2021, 05:59 AM
  • 02 0376_02 0375_05122021_230959.mp4

Date
05/12/2021
W/O
890910
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00250
PipeID
P02691
Time
10:59 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8907
Sewer Name
02 DOWNEY AVENUE EXTENSION TRUNK
City
PARAMOUNT
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_890910_TV02126_MAY2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 0376
Downstream MH
02 0375
Dir. of Survey
Downstream
Length Surveyed
331 ft.
Total Length
331 ft.
Structural Index
3
Structural Quick
3M2L
Structural Rating
334
O&M Index
2
O&M Quick
412L
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
468
Pipe schematic from manhole 02 0376 to 02 0375
MH: 02 0376MH: 02 0375downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 02 03760 ft. MWL - Water Level, 45 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN76.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"108.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"160 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN198.1 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start211.5 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish219.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"328 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish329.1 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish329.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish331 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/OPEN331 ft. AMH - Downstream Manhole, Survey Ends - 02 0375

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    198.1 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
2DAGS
198.1FL
219.4TFC
0MWM
108.2TFC
76.8TFC
328SSS
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
211.5FL
160TFUNKNOWN
2CM
329.1CM
331MGOCONN @ MH 3 O'CLOCK/OPEN
331AMH02 0375
329.1DAGS
2SSS
32.8TBOPEN
0AMH02 0376
0MWL

Properties (7)

additional_info
630069051221201
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-05-12T22:59:04-07:00
documentation
PRO PIPE
is_lateral_inspection
false