Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 26, 2021, 09:53 AM
  • 22 0487_22 0486_04262021_031333.mp4

Date
04/26/2021
W/O
886009
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00800
PipeID
P16826
Time
2:53 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8744
Sewer Name
22 COVINA CONNECTION EXTENSION TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_886009_TV22031_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
22 0486
Downstream MH
22 0487
Dir. of Survey
Upstream
Length Surveyed
330.6 ft.
Total Length
330.6 ft.
Structural Index
3
Structural Quick
4I3Y
Structural Rating
731
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
3
Overall Quick
Overall Rating
861
Pipe schematic from manhole 22 0486 to 22 0487
MH: 22 0486MH: 22 0487upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 04870.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish4.4 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish33 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN36 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"84 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"87.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"113.5 ft. FL - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES123.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN126.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"177.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN180.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"225.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN228.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"256.9 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES, Start266 ft. FM - Fracture Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES276.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"279.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"315.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"318.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"328.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start328.6 ft. MGO - General Observation - 40% MAG COAT328.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start328.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start328.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start330.6 ft. MWL - Water Level, 35 %of cross sectional area330.6 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE330.6 ft. MWM - Water Mark, 40 %of cross sectional area330.6 ft. AMH - Downstream Manhole, Survey Begins - 22 0486

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

    64.6 ft. - Fracture Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    73.7 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (32)

DistanceCodeObservation
105.2TFOPEN
2MGO40% MAG COAT
326.2FM
12TFC
204.5TFC
51TFC
0MWL
328CM
64.6FM
217.1FL
243.4TFC
2CM
330.6AMH22 0487
102.1TFC
207.2TFOPEN
15TFC
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
2DAGS
297.6TFOPEN
294.6TFC
0MWM
54TFC
329.9SAV
246.6TFC
328SSS
0AMH22 0486
2.5SAV
150.1TFC
328DAGS
73.7FM
153.3TFOPEN
2SSS

Properties (7)

additional_info
630074042621001
custom_field_three
AGGREGATE VISIBLE/MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-04-26T02:53:09-07:00
documentation
PROPIPE
is_lateral_inspection
false