Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 13, 2021, 09:09 AM
  • 14 0051_14 0050_04132021_022122.mp4

Date
04/13/2021
W/O
886341
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00577
PipeID
P18063
Time
2:09 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8777
Sewer Name
14 TRUNK "A"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
06
Purpose
Routine Assessment
Project
RFIR_WO_886341_TV14039_APR2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
14 0051
Downstream MH
14 0050
Dir. of Survey
Downstream
Length Surveyed
280.6 ft.
Total Length
280.6 ft.
Structural Index
3
Structural Quick
5J3J
Structural Rating
550
O&M Index
2
O&M Quick
412J
O&M Rating
114
Overall Index
3
Overall Quick
Overall Rating
664
Pipe schematic from manhole 14 0051 to 14 0050
MH: 14 0051MH: 14 0050downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 00512 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 35% MAG COAT2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start80 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"144.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"185.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"278.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish278.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish278.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish278.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish280.6 ft. AMH - Downstream Manhole, Survey Ends - 14 0050

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
278.2DAGS
280.6AMH14 0050
278.2SAP
278.2SSS
185.4TFC
144.7TFC
2SAP
0MWM
2DAGS
2SRV
278.2SRV
0MWL
0AMH14 0051
80TFC
2MGO35% MAG COAT
2SSS

Properties (7)

additional_info
630069041221201
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-04-13T02:09:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false