Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 12, 2021, 10:12 AM
  • 14 0048A_14 0048_04122021_032300.mp4

Date
04/12/2021
W/O
886341
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00577
PipeID
P18061
Time
3:12 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8776
Sewer Name
14 TRUNK "A"
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
06
Purpose
Routine Assessment
Project
RFIR_WO_886341_TV14039_APR2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
14 0048A
Downstream MH
14 0048
Dir. of Survey
Downstream
Length Surveyed
175.3 ft.
Total Length
175.3 ft.
Structural Index
3
Structural Quick
5F3F
Structural Rating
340
O&M Index
2
O&M Quick
412F
O&M Rating
72
Overall Index
3
Overall Quick
Overall Rating
412
Pipe schematic from manhole 14 0048A to 14 0048
MH: 14 0048AMH: 14 0048downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 14 0048A0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 35% MAG COAT2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start169.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"173.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish173.6 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish173.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish173.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish175.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0048

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
2DAGS
2SAP
2MGO35% MAG COAT
0MWM
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
173.6SSS
2SRV
2SSS
173.6SRV
0AMH14 0048A
175.3AMH14 0048
173.6SAP
169.4TFC
173.6DAGS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
0MWL

Properties (7)

additional_info
630069041221001
custom_field_three
VSIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-04-12T03:12:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false