Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 9, 2021, 06:17 AM
  • 14 0082_14 0081A_04082021_232746.mp4

Date
04/08/2021
W/O
886341
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00577
PipeID
P18097
Time
11:17 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8774
Sewer Name
14 TRUNK "A"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_886341_TV14039_APR2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
14 0082
Downstream MH
14 0081A
Dir. of Survey
Downstream
Length Surveyed
281.5 ft.
Total Length
281.5 ft.
Structural Index
3
Structural Quick
5H3J
Structural Rating
490
O&M Index
2
O&M Quick
412J
O&M Rating
114
Overall Index
3
Overall Quick
Overall Rating
604
Pipe schematic from manhole 14 0082 to 14 0081A
MH: 14 0082MH: 14 0081Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 00820 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGO - General Observation - 65% MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start279.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish279.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish279.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish279.4 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish281.5 ft. AMH - Downstream Manhole, Survey Ends - 14 0081A281.5 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
2MGO65% MAG COAT
2SAP
279.4SAP
0AMH14 0082
279.4SSS
0MWL
2SRV
0MWM
2DAGS
281.5AMH14 0081A
281.5MGOCONN @ MH 3 O'CLOCK/ACTIVE
279.4DAGS
2SSS
279.4SRV

Properties (7)

additional_info
630069040821201
custom_field_three
PROJECTING AGGREGATE/VISIBLE REINFORCEMENT
custom_field_two
2
customer
1
datetime
2021-04-08T23:17:09-07:00
documentation
PRO PIPE
is_lateral_inspection
false