Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 5, 2021, 09:01 AM
  • 14 0411_14 0410_05052021_021645.mp4

Date
05/05/2021
W/O
890869
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18494
Time
2:01 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8800
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
06
Purpose
Routine Assessment
Project
WO_890869_TV14063_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
14 0411
Downstream MH
14 0410
Dir. of Survey
Downstream
Length Surveyed
371.3 ft.
Total Length
371.3 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
365
O&M Index
2
O&M Quick
412N
O&M Rating
150
Overall Index
2
Overall Quick
Overall Rating
515
Pipe schematic from manhole 14 0411 to 14 0410
MH: 14 0411MH: 14 0410downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04110 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start368.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish368.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish368.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish371.3 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK371.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0410

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
2SSS
371.3MGOCONNECTION AT MH 3 O'CLOCK
368.9SAP
0MWM
2SAP
0AMH14 0411
368.9SSS
368.9DAGS
2DAGS
0MWL
371.3AMH14 0410

Properties (7)

additional_info
630069050421202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-05-05T02:01:27-07:00
documentation
PRO PIPE
is_lateral_inspection
false