Wastewater/Activity/PacpInspection/1.0May 6, 2021, 07:03 AM
  • 14 0410_14 0409_05062021_001613.mp4

Date
05/06/2021
W/O
890869
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18493
Time
12:03 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8901
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
06
Purpose
Routine Assessment
Project
WO_890869_TV14063_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
14 0410
Downstream MH
14 0409
Dir. of Survey
Downstream
Length Surveyed
371.6 ft.
Total Length
371.6 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
365
O&M Index
2
O&M Quick
2N00
O&M Rating
146
Overall Index
2
Overall Quick
Overall Rating
511
Pipe schematic from manhole 14 0410 to 14 0409
MH: 14 0410MH: 14 0409downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 04100 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start369.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish369.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish369.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish371.6 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK371.6 ft. AMH - Downstream Manhole, Survey Ends - 14 0409

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
371.6MGOCONNECTION AT MH 3 O'CLOCK
0AMH14 0410
2SAP
369.5DAGS
369.5SSS
0MWM
371.6AMH14 0409
2DAGS
0MWL
2SSS
369.5SAP
0MGOCONNECTION AT MH 3 O'CLOCK

Properties (7)

additional_info
630069050521201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-05-06T00:03:24-07:00
documentation
PRO PIPE
is_lateral_inspection
false