Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 6, 2021, 07:16 AM
  • 14 0409_14 0408_05062021_002923.mp4

Date
05/06/2021
W/O
890869
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18492
Time
12:16 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8901
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
06
Purpose
Routine Assessment
Project
WO_890869_TV14063_MAY2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
14 0409
Downstream MH
14 0408
Dir. of Survey
Downstream
Length Surveyed
380.3 ft.
Total Length
380.3 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
375
O&M Index
2
O&M Quick
412N
O&M Rating
154
Overall Index
2
Overall Quick
Overall Rating
529
Pipe schematic from manhole 14 0409 to 14 0408
MH: 14 0409MH: 14 0408downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04090 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start268 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"378.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish378.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish378.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish380.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0408

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
378.3SAP
0MWM
2SSS
378.3SSS
0MWL
0AMH14 0409
380.3AMH14 0408
2SAP
2DAGS
378.3DAGS
268TF
0MGOCONNECTION AT MH 3 O'CLOCK

Properties (7)

additional_info
630069050521201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-05-06T00:16:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false