Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 4, 2021, 05:35 AM
  • 14 0433A_14 0433_05032021_224435.mp4

Date
05/03/2021
W/O
890935
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18519
Time
10:35 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8798
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_890935_TV14019_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0433A
Downstream MH
14 0433
Dir. of Survey
Downstream
Length Surveyed
93.8 ft.
Total Length
93.8 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
90
O&M Index
2
O&M Quick
2C00
O&M Rating
36
Overall Index
2
Overall Quick
Overall Rating
126
Pipe schematic from manhole 14 0433A to 14 0433
MH: 14 0433AMH: 14 0433downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0433A0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - POSSIBLE CONNECTION32.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"57.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"80.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"91.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish91.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish91.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish93.8 ft. AMH - Downstream Manhole, Survey Ends - 14 0433

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
0MWL
93.8AMH14 0433
80.8TFC
91.6SSS
91.6SAP
7.2TFPOSSIBLE CONNECTION
2SAP
57.1TFC
0AMH14 0433A
2DAGS
91.6DAGS
32.8TFC
2SSS
0MWM
0MGOCONNECTION AT MH 9 O'CLOCK

Properties (7)

additional_info
630069050321201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-05-03T22:35:45-07:00
documentation
PRO PIPE
is_lateral_inspection
false