Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 4, 2021, 06:49 AM
  • 14 0430_14 0429_05042021_001641.mp4

Date
05/03/2021
W/O
890935
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18514
Time
11:49 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8798
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_890935_TV14019_MAY2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0430
Downstream MH
14 0429
Dir. of Survey
Downstream
Length Surveyed
440 ft.
Total Length
440 ft.
Structural Index
3
Structural Quick
3P2P
Structural Rating
435
O&M Index
2
O&M Quick
493H
O&M Rating
345
Overall Index
2
Overall Quick
Overall Rating
780
Pipe schematic from manhole 14 0430 to 14 0429
MH: 14 0430MH: 14 0429downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 04300 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start30.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"55.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"78.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"104.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"170 ft. MWL - Water Level, 50 %of cross sectional area180.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"205.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"206.1 ft. MCU - Camera Underwater, Start211.2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS UNDER WATER244.4 ft. MCU - Camera Underwater, Finish305.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"329.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"354 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"365 ft. SZ - Surface Other, from 07 to 08 o'clock, within 8 inches of joint: NO - PIECE OF CONCRETE378.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"402.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"430 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - POSSIBLE CONNECTION437.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish437.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish437.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish437.4 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish440 ft. AMH - Downstream Manhole, Survey Ends - 14 0429

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (29)

DistanceCodeObservation
354TFC
206.1MCU
211.2DSZDEBRIS UNDER WATER
55.4TFC
365SZPIECE OF CONCRETE
437.4SSS
205.1TFC
437.4DAGS
378.9TFC
30.5TFC
305.5TFC
437.4SAP
440AMH14 0429
0AMH14 0430
2SAP
402.5TFC
170MWL
244.4MCU
329.6TFC
78.5TFC
430TFPOSSIBLE CONNECTION
104.2TFC
0MGOCONNECTION AT MH 3 O'CLOCK
0MWL
2SSS
437.4DSZ
180.3TFC
0MWM
2DAGS

Properties (7)

additional_info
630069050321201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-05-03T23:49:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false