C 0377_C 0376_04152021_012147.mp4
3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
145.5 ft. - Infiltration Runner, at 04 o'clock, within 8 inches of joint: YES
226.1 ft. - Infiltration Runner, at 04 o'clock, within 8 inches of joint: YES
274.4 ft. - Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES
539.2 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
555.5 ft. - Infiltration Dripper, from 01 to 02 o'clock, within 8 inches of joint: YES
612.2 ft. - Infiltration Runner, at 04 o'clock, within 8 inches of joint: YES
622.8 ft. - Infiltration Dripper, from 09 to 03 o'clock, within 8 inches of joint: YES
630.4 ft. - Infiltration Runner, at 04 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 539.2 | ID | — |
| 0 | AMH | C 0377 |
| 622.8 | ID | — |
| 638.9 | MGO | CONNECTION AT THE MH 3 OC'LOCK |
| 612.2 | IR | — |
| 638.9 | AMH | C 0376 |
| 3 | SAP | — |
| 145.5 | IR | — |
| 274.4 | IR | — |
| 0 | MWM | — |
| 3 | MGO | MAG COAT |
| 0 | MWL | — |
| 638.9 | SAP | — |
| 555.5 | ID | — |
| 630.4 | IR | — |
| 226.1 | IR | — |