- Date
- 05/04/2021
- W/O
- 891206
- Weather
- Dry
- Operator/Surveyor
- B.FUGATE
- Sewer ID
- Z01024
- PipeID
- P24339
- Time
- 2:40 AM
- Certificate
- U-508-7069
- System Owner
- 1
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K8858
- Sewer Name
- 29 PACIFIC COAST HIGHWAY TRUNK
- City
- SIGNAL HILL
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 29
- Page No.
- 04
- Purpose
- Routine Assessment
- Project
- RFIR_WO_891206_TV29083_MAY2021
- Sewer Type
- Gravity
- Material
- NRCP
- Shape
- Circular
- Height
- 8 in.
- Width
- 8 in.
- Upstream MH
- 29 0321
- Downstream MH
- 29 0322
- Dir. of Survey
- Upstream
- Length Surveyed
- 331.9 ft.
- Total Length
- 331.9 ft.
- Structural Index
- 3
- Structural Quick
- 4E3M
- Structural Rating
- 320
- O&M Index
- 0
- O&M Quick
- 0000
- O&M Rating
- 0
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 320
Pipe schematic from manhole 29 0321 to 29 0322 Observation photos (6)

2.1 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

20.7 ft. - Material Change, Concrete pipe (non-reinfored)

43.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

82.1 ft. - Fracture Longitudinal, at 01 o'clock, within 8 inches of joint: YES

131.1 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

184.6 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start