Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 14, 2021, 10:04 AM
  • J 0502_J 0197_5142021_034431.mp4

Date
05/14/2021
W/O
0879976
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00057
PipeID
P11442
Time
3:04 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1806
Sewer Name
J JOINT OUTFALL J - UNIT 1E
City
PALO VERDES
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
47
Purpose
Capital Improvement Program Assesment
Project
20210511MDM_JOINT_OUTFALL_J_UNIT_1E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
J 0502
Downstream MH
J 0197
Dir. of Survey
Downstream
Length Surveyed
315.8 ft.
Total Length
315.8 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole J 0502 to J 0197
MH: J 0502MH: J 0197downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:40AM2 ft. MGO - General Observation - 90% OLD MAG COAT START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - ROCKS63.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE211.2 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG247.3 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC315.3 ft. MGO - General Observation - 90% OLD MAG COAT315.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - ROCKS315.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE315.8 ft. AMH - Downstream Manhole, Survey Ends - 4:10PM

Observation photos (5)

  • General Observation - 90% OLD MAG COAT START

    2 ft. - General Observation - 90% OLD MAG COAT START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    63.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

    211.2 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    247.3 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

Observations (13)

DistanceCodeObservation
315.3MGO90% OLD MAG COAT
0MWM
2MGO90% OLD MAG COAT START
0MWL
63.1SSSBLISTERING PEELING CONCRETE
211.2SAVSEVERE AGG
0AMH3:40AM
315.3DSZROCKS
315.8AMH4:10PM
315.3SSSBLISTERING PEELING CONCRETE
2SSSBLISTERING PEELING CONCRETE
2DSZROCKS
247.3SAVSEVERE AGG SPORATIC

Properties (6)

custom_field_three
SEVERE AGG VISIBLE SPORATIC
custom_field_two
3
customer
LACSD
datetime
2021-05-14T03:04:47-07:00
documentation
MARTIN,OLIVER 111,RUVALCABA,BARR
is_lateral_inspection
false