Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 13, 2021, 09:31 AM
  • J 022A_J 0222_5132021_023429.mp4

Date
05/13/2021
W/O
0879983
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00057
PipeID
P11468
Time
2:31 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1804
Sewer Name
J JOINT OUTFALL J - UNIT 1E
City
PALO VERDES
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
47
Purpose
Capital Improvement Program Assesment
Project
20210511MDM_JOINT_OUTFALL_J_UNIT_1E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
J 0222A
Downstream MH
J 0222
Dir. of Survey
Downstream
Length Surveyed
436.3 ft.
Total Length
436.3 ft.
Structural Index
3
Structural Quick
3422
Structural Rating
16
O&M Index
3
O&M Quick
3422
O&M Rating
16
Overall Index
3
Overall Quick
Overall Rating
32
Pipe schematic from manhole J 0222A to J 0222
MH: J 0222AMH: J 0222downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 2:35AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE10.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE17.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG26.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG41.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK53 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG54.4 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK68.1 ft. SAP - Surface Aggregate Projecting, from 12 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG141.6 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - ROCKS160.8 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - ROCKS175.4 ft. SAP - Surface Aggregate Projecting, from 12 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVRE AGG200.4 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - ROCKS292.6 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - ROCKS339.6 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - ROCKS379.8 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - ROCKS436.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE436.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG

Observation photos (7)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    10.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    17.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    26.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    53 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Deposits Settled Other,  20 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - ROCK

    54.4 ft. - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK

  • Surface Aggregate Projecting, from 12 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    68.1 ft. - Surface Aggregate Projecting, from 12 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

Observations (21)

DistanceCodeObservation
10.6SSSBLISTERING PEELING CONCRETE
54.4DSZROCK
41.4DSZROCK
0MWL
436.3SSSBLISTERING PEELING CONCRETE
17.5SAVSEVERE AGG
160.8DSZROCKS
436.3SAVSEVERE AGG
200.4DSZROCKS
68.1SAPSEVERE AGG
339.6DSZROCKS
292.6DSZROCKS
26.5SAVSEVERE AGG
53SAVSEVERE AGG
175.4SAPSEVRE AGG
141.6DSZROCKS
0MWM
379.8DSZROCKS
2SSSBLISTERING PEELING CONCRETE
0MGOConn. @ Mh, 9 O' Clock. Active
0AMH2:35AM

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2021-05-13T02:31:44-07:00
documentation
MARTIN,OLIVER 111,CASTILLO,BARR
is_lateral_inspection
false