J 0232_J 0231_5112021_041105.mp4
0 ft. - Downstream Manhole, Survey Begins - 4:10AM(MH IS ABANDONED AND CAPPED
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
17.5 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
79.3 ft. - Surface Reinforcement Corroded, from 09 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
182.1 ft. - Surface Reinforcement Corroded, from 11 to 12 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
185.7 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
282.1 ft. - Surface Reinforcement Corroded, from 02 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
322 ft. - Surface Reinforcement Corroded, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 347.9 | AMH | 4:35AM |
| 194 | SAM | SEVERE AGG |
| 347.4 | SSS | BLISTERING PEELING CONCRETE |
| 185.7 | SAM | SEVERE AGG |
| 33.2 | DSZ | ROCKS |
| 0 | AMH | 4:10AM(MH IS ABANDONED AND CAPPED |
| 282.1 | SRC | CIRCUM REBAR |
| 0 | MWL | — |
| 0 | MWM | — |
| 322 | SRC | CIRCUM REBAR |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 347.4 | MGO | Conn. @ Mh, 9 O' Clock. Capped |
| 182.1 | SRC | CIRCUM REBAR |
| 67.8 | DSZ | ROCKS |
| 17.5 | SRC | CIRCUM REBAR |
| 347.4 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 79.3 | SRC | CIRCUM REBAR |