Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 11, 2021, 07:27 AM
  • J 0230_J 0493_5112021_003928.mp4

Date
05/11/2021
W/O
0879983
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00057
PipeID
P24759
Time
12:27 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1802
Sewer Name
J JOINT OUTFALL J - UNIT 1E
City
PALO VERDES
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
47
Purpose
Capital Improvement Program Assesment
Project
20210511MDM_JOINT_OUTFALL_J_UNIT_1E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
J 0230
Downstream MH
J 0493
Dir. of Survey
Downstream
Length Surveyed
74.8 ft.
Total Length
74.8 ft.
Structural Index
3
Structural Quick
4134
Structural Rating
22
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
22
Pipe schematic from manhole J 0230 to J 0493
MH: J 0230MH: J 0493downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:35AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. MGO - General Observation - MAG COAT 80% START10.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE18.6 ft. SSS - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE21.1 ft. SAV - Surface Aggregate Visible, from 08 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG VERY SPORATIC60.6 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG63.1 ft. SAV - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG70.3 ft. SAV - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG74.5 ft. SAV - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG74.5 ft. SAM - Surface Aggregate Missing, from 04 to 08 o'clock, within 8 inches of joint: NO - SEVERE AGG BELOW MH LINER74.5 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO, Finish - SEVERE AGG74.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE74.8 ft. AMH - Downstream Manhole, Survey Ends - 1:00AM

Observation photos (9)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • General Observation - MAG COAT 80% START

    2 ft. - General Observation - MAG COAT 80% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    10.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

  • Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    18.6 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG VERY SPORATIC

    21.1 ft. - Surface Aggregate Visible, from 08 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG VERY SPORATIC

  • Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG

    60.6 ft. - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG

  • Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    63.1 ft. - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG

    70.3 ft. - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Missing, from 04 to 08 o'clock, within 8 inches of joint: NO - SEVERE AGG  BELOW MH LINER

    74.5 ft. - Surface Aggregate Missing, from 04 to 08 o'clock, within 8 inches of joint: NO - SEVERE AGG BELOW MH LINER

Observations (16)

DistanceCodeObservation
21.1SAVSEVERE AGG VERY SPORATIC
63.1SAVSEVERE AGG
74.5SAVSEVERE AGG
2SSSBLISTERING PEELING CONCRETE
60.6SAVSEVERE AGG
74.5SAMSEVERE AGG BELOW MH LINER
74.5SAVSEVERE AGG
18.6SSSPEELING CONCRETE
0MWM
70.3SAVSEVERE AGG
0AMH12:35AM
2MGOMAG COAT 80% START
0MWL
10.2SSSBLISTERING PEELING CONCRETE
74.5SSSBLISTERING PEELING CONCRETE
74.8AMH1:00AM

Properties (7)

custom_field_three
SEVERE AGG VIVIBLE
custom_field_two
3
customer
LACSD
datetime
2021-05-11T00:27:22-07:00
documentation
MARTIN,OLIVER 111,CASTILLO,BARR
is_lateral_inspection
false
year_laid
20020501