Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 2, 2016, 10:06 AM
  • 02 0107_02 0107_110216_032402.mp4

Date
11/02/2016
W/O
602602
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00237
PipeID
P02274
Time
3:06 AM
Certificate
U-507-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3754
Sewer Name
02 BELLFLOWER TRUNK
City
BELLFLOWER, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
38
Purpose
Routine Assessment
Project
WO_602602_TV02019_NOV2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
02 0107
Downstream MH
02 0106
Dir. of Survey
Downstream
Length Surveyed
309.5 ft.
Total Length
309.6 ft.
Structural Index
2
Structural Quick
2111
Structural Rating
3
O&M Index
2
O&M Quick
312K
O&M Rating
125
Overall Index
2
Overall Quick
Overall Rating
128
Pipe schematic from manhole 02 0107 to 02 0106
MH: 02 0107MH: 02 0106downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 01070 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area1.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start31.3 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES35.4 ft. RML - Roots Medium Lateral, from 02 to 04 o'clock, 15 %, within 8 inches of joint: YES35.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"68.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"73.1 ft. CC - Crack Circumferential, from 07 to 11 o'clock, within 8 inches of joint: YES73.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"76.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"119 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"127.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"130 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"169.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"171.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"213.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"216.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"270 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"284.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"307.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish309.6 ft. AMH - Downstream Manhole, Survey Ends - 02 0106

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    1.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    31.3 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Roots Medium Lateral, from 02 to 04 o'clock, 15 %, within 8 inches of joint: YES

    35.4 ft. - Roots Medium Lateral, from 02 to 04 o'clock, 15 %, within 8 inches of joint: YES

  • Crack Circumferential, from 07 to 11 o'clock, within 8 inches of joint: YES

    73.1 ft. - Crack Circumferential, from 07 to 11 o'clock, within 8 inches of joint: YES

Observations (23)

DistanceCodeObservation
68.1TFC
0MWL
130TFC
127.5TFC
31.3CL
119TF
73.9TFA
284.6TFA
0AMH02 0107
76.8TFC
270TFA
35.4RML
169.4TFA
35.4TFA
1.2DAGS
309.6AMH02 0106
216.2TFA
171.2TFA
213.2TFA
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
73.1CC
307.3DAGS

Properties (6)

additional_info
SC303746
custom_field_two
4
customer
LACSD
datetime
2016-11-02T03:06:00-07:00
documentation
PRO-PIPE
is_lateral_inspection
false