Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 6, 2015, 08:15 AM
  • 08 0495_08 0494_20151106_002108.mp4

Date
11/06/2015
W/O
531054
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00021
PipeID
P00554
Time
12:15 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2549
Sewer Name
08 VICTORIA STREET TRUNK
City
CARSON, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
04
Purpose
Routine Assessment
Project
WO_531054_TV08032_OCT2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
08 0494
Downstream MH
08 0495
Dir. of Survey
Upstream
Length Surveyed
55.8 ft.
Total Length
55.8 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
2
O&M Quick
2A00
O&M Rating
20
Overall Index
2
Overall Quick
Overall Rating
22
Pipe schematic from manhole 08 0494 to 08 0495
MH: 08 0494MH: 08 0495upstream0 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK0 ft. AMH - Upstream Manhole, Survey Ends - 08 0495 (0021)2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish36.6 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES51.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start55.8 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK55.8 ft. MWL - Water Level, 10 %of cross sectional area55.8 ft. AMH - Downstream Manhole, Survey Begins - 08 0494 (0016)55.8 ft. MWM - Water Mark, 15 %of cross sectional area55.8 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK

Observations (10)

DistanceCodeObservation
19.2CL
55.8MGOLATERAL AT MH 3 OCLOCK
0MGOLATERAL AT MH 3 OCLOCK
0MWL
53.2DAGS
0AMH08 0494 (0016)
0MWM
4.1DAGS
55.8AMH08 0495 (0021)
0MGOLATERAL AT MH 9 OCLOCK

Properties (6)

additional_info
SC205617
custom_field_two
4
customer
LACSD
datetime
2015-11-06T00:15:31-08:00
documentation
PRO-PIPE
is_lateral_inspection
false