Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 13, 2015, 08:33 AM
  • 14 0184_14 0183_20151113_004659.mp4

Date
11/13/2015
W/O
525225
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18223
Time
12:33 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2829
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
08
Purpose
Routine Assessment
Project
WO_525225_TV14034_SEPT2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
14 0184
Downstream MH
14 0183
Dir. of Survey
Downstream
Length Surveyed
352.1 ft.
Total Length
352.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
412M
O&M Rating
144
Overall Index
2
Overall Quick
Overall Rating
144
Pipe schematic from manhole 14 0184 to 14 0183
MH: 14 0184MH: 14 0183downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 01840.1 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start30.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"87.3 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"138 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"189.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"239.5 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"286.3 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"337.4 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"350.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish352.1 ft. AMH - Downstream Manhole, Survey Ends - 14 0183

Observations (13)

DistanceCodeObservation
350.8DAGS
0MWL
2DAGS
337.4TF
0AMH14 0184
352.1AMH14 0183
0.1MWM
239.5TFC
286.3TFC
138TFC
87.3TFA
189.2TFC
30.6TFC

Properties (6)

additional_info
SC204163
custom_field_two
4
customer
LACSD
datetime
2015-11-13T00:33:08-08:00
documentation
PRO PIPE
is_lateral_inspection
false