Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 26, 2018, 05:00 PM
  • 30 0015A_30 0015_6262018_100324.mp4

Date
06/26/2018
W/O
0706884
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P17717
Time
10:00 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7739
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
MANHATTAN BEACH
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
20180622DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
30 0015A
Downstream MH
30 0015
Dir. of Survey
Downstream
Length Surveyed
14.9 ft.
Total Length
14.9 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 30 0015A to 30 0015
MH: 30 0015AMH: 30 0015downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:01 AM0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG4.6 ft. MGP - General Photograph10.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish10.2 ft. MGP - General Photograph10.2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 70% MAG10.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish14.9 ft. AMH - Downstream Manhole, Survey Ends - 10:08 AM14.9 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach14.9 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

  • General Photograph

    4.6 ft. - General Photograph

  • General Photograph

    10.2 ft. - General Photograph

Observations (15)

DistanceCodeObservation
0AMH10:01 AM
4.6MGP
14.9AMH10:08 AM
2SSS
10.2SSS
2SAP
0MWL
14.9MGOPeeling & Flaking Throughout The Reach
10.2MGP
10.2SZ70% MAG
10.2SAP
14.9MGOGREASE THROUGHOUT THE REACH (5%)
2SZ70% MAG
0MWM
0MGOConn. @ Mh, 3 O' Clock. Active

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-06-26T10:00:30-07:00
documentation
FRANKLIN, SHADLER, VENDRYES, PARAISO
is_lateral_inspection