Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 25, 2018, 06:15 PM
  • 30 0016_30 0015A_6252018_112143.mp4

Date
06/25/2018
W/O
0706884
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P25501
Time
11:15 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7738
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
MANHATTAN BEACH
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
20180622DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
30 0016
Downstream MH
30 0015A
Dir. of Survey
Downstream
Length Surveyed
240.3 ft.
Total Length
240.3 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 30 0016 to 30 0015A
MH: 30 0016MH: 30 0015Adownstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:17 AM0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG5.2 ft. MGP - General Photograph22.1 ft. MGP - General Photograph100.3 ft. MGP - General Photograph140.6 ft. MGP - General Photograph240 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish240 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish240 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 70% MAG240 ft. MSA - Survey Abandoned - FLOAT FLIPPED240.3 ft. MGP - General Photograph240.3 ft. MGP - General Photograph

Observation photos (8)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

  • General Photograph

    5.2 ft. - General Photograph

  • General Photograph

    22.1 ft. - General Photograph

  • General Photograph

    100.3 ft. - General Photograph

  • General Photograph

    140.6 ft. - General Photograph

  • General Photograph

    240.3 ft. - General Photograph

  • General Photograph

    240.3 ft. - General Photograph

Observations (16)

DistanceCodeObservation
2SSS
240SSS
240SAP
5.2MGP
100.3MGP
0MWM
140.6MGP
0AMH11:17 AM
2SAP
240SZ70% MAG
22.1MGP
240.3MGP
240MSAFLOAT FLIPPED
0MWL
240.3MGP
2SZ70% MAG

Properties (5)

custom_field_two
5
customer
LACSD
datetime
2018-06-25T11:15:46-07:00
documentation
FRANKLIN, IGNACIO, VENDRYES, PARAISO
is_lateral_inspection
false