Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 22, 2018, 03:44 PM
  • 30 0025_30 0024_6222018_094639.mp4

Date
06/22/2018
W/O
0706884
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P17726
Time
8:44 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7737
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
MANHATTAN BEACH
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
20180622DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
30 0025
Downstream MH
30 0024
Dir. of Survey
Downstream
Length Surveyed
387.4 ft.
Total Length
387.4 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 30 0025 to 30 0024
MH: 30 0025MH: 30 0024downstream0 ft. AMH - Upstream Manhole, Survey Begins - 8:50 AM0.1 ft. MWL - Water Level, 15 %of cross sectional area0.1 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start23 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4" - 5% GREASE32.2 ft. MGP - General Photograph54.4 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start130.3 ft. MGP - General Photograph350.2 ft. MGP - General Photograph384.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish385.2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish385.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish385.3 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 60% MAG387.3 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)387.4 ft. AMH - Downstream Manhole, Survey Ends - 10:10 AM

Observation photos (8)

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4" - 5% GREASE

    23 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4" - 5% GREASE

  • General Photograph

    32.2 ft. - General Photograph

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    54.4 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    130.3 ft. - General Photograph

  • General Photograph

    350.2 ft. - General Photograph

Observations (17)

DistanceCodeObservation
0AMH8:50 AM
385.2SRV
0.1MWL
387.3MGOGREASE THROUGHOUT THE REACH (5%)
385.3SZ60% MAG
2SZ60% MAG
387.4AMH10:10 AM
384.9SSS
385.2SAV
350.2MGP
2SSS
32.2MGP
2SAV
0.1MWM
23TFA5% GREASE
54.4SRV
130.3MGP

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-06-22T08:44:45-07:00
documentation
FRANKLIN, IGNACIO, VENDRYES
is_lateral_inspection
false