Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 27, 2018, 06:05 PM
  • 30 0015_30 0014_6272018_114652.mp4

Date
06/27/2018
W/O
0706884
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P17716
Time
11:05 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7742
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
MANHATTAN BEACH
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
20180622DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
30 0015
Downstream MH
30 0014
Dir. of Survey
Downstream
Length Surveyed
10 ft.
Total Length
10 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 30 0015 to 30 0014
MH: 30 0015MH: 30 0014downstream0 ft. AMH - Upstream Manhole, Survey Begins - 11:06 AM0.1 ft. MWL - Water Level, 25 %of cross sectional area0.1 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGP - General Photograph2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.5 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG9 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 70% MAG9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish10 ft. AMH - Downstream Manhole, Survey Ends - 11:54 AM10 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"10 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)10 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach

Observation photos (6)

  • Water Level, 25 %of cross sectional area

    0.1 ft. - Water Level, 25 %of cross sectional area

  • Water Mark, 30 %of cross sectional area

    0.1 ft. - Water Mark, 30 %of cross sectional area

  • General Photograph

    2 ft. - General Photograph

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

    3.5 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

  • Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"

    10 ft. - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"

Observations (12)

DistanceCodeObservation
10AMH11:54 AM
9SZ70% MAG
0.1MWL
10TFC
3.5SZ70% MAG
10MGOGREASE THROUGHOUT THE REACH (5%)
0.1MWM
0AMH11:06 AM
10MGOPeeling & Flaking Throughout The Reach
2MGP
2SSS
9SSS

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-06-27T11:05:19-07:00
documentation
FRANKLIN, SHADLER, VENDRYES, PARAISO
is_lateral_inspection
false