Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 26, 2018, 04:13 PM
Date
06/26/2018
W/O
0706884
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P25501
Time
9:13 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7739
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
MANHATTAN BEACH
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
20180622DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
30 0016
Downstream MH
30 0015A
Dir. of Survey
Downstream
Length Surveyed
278.2 ft.
Total Length
278.2 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 30 0016 to 30 0015A
MH: 30 0016MH: 30 0015Adownstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start0 ft. AMH - Upstream Manhole, Survey Begins - 9:15 AM2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start24.6 ft. MGP - General Photograph117.2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start198.6 ft. MGP - General Photograph250.4 ft. MGP - General Photograph250.6 ft. MGP - General Photograph277 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish277.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish277.2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish277.2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 70% MAG277.2 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach277.3 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)277.3 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active278.2 ft. AMH - Downstream Manhole, Survey Ends - 9:59 AM

Observation photos (8)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    0 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    24.6 ft. - General Photograph

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    117.2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    198.6 ft. - General Photograph

  • General Photograph

    250.4 ft. - General Photograph

  • General Photograph

    250.6 ft. - General Photograph

Observations (19)

DistanceCodeObservation
278.2AMH9:59 AM
277.3MGOGREASE THROUGHOUT THE REACH (5%)
250.6MGP
277.2SRV
277.2SZ70% MAG
2SZ70% MAG
277.3MGOConn. @ Mh, 3 O' Clock. Active
277.1SSS
0MWL
0MWM
250.4MGP
0SAV
2SSS
277SAV
117.2SRV
24.6MGP
0AMH9:15 AM
277.2MGOPeeling & Flaking Throughout The Reach
198.6MGP

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-06-26T09:13:07-07:00
documentation
FRANKLIN, SHADLER, VENDRYES, PARAISO
is_lateral_inspection
false