Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 25, 2018, 05:50 PM
  • 30 0017_30 0016_6252018_105312.mp4

Date
06/25/2018
W/O
0706884
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P17718
Time
10:50 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7738
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
MANHATTAN BEACH
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
20180622DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
30 0017
Downstream MH
30 0016
Dir. of Survey
Downstream
Length Surveyed
343 ft.
Total Length
343 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 30 0017 to 30 0016
MH: 30 0017MH: 30 0016downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 10:51 AM2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30.5 ft. MGP - General Photograph30.5 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start130.8 ft. MGP - General Photograph215.9 ft. MGP - General Photograph313.6 ft. MGP - General Photograph333.6 ft. MGP - General Photograph340 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish340 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish340 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 70% MAG342.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish343 ft. AMH - Downstream Manhole, Survey Ends - 11:15 AM

Observation photos (7)

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

  • General Photograph

    30.5 ft. - General Photograph

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    30.5 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    130.8 ft. - General Photograph

  • General Photograph

    215.9 ft. - General Photograph

  • General Photograph

    313.6 ft. - General Photograph

  • General Photograph

    333.6 ft. - General Photograph

Observations (17)

DistanceCodeObservation
342.1SRV
215.9MGP
2SZ70% MAG
0MWM
340SAV
130.8MGP
0MWL
343AMH11:15 AM
2SSS
0AMH10:51 AM
30.5MGP
2SAV
30.5SRV
340SSS
313.6MGP
333.6MGP
340SZ70% MAG

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-06-25T10:50:30-07:00
documentation
FRANKLIN, IGNACIO, VENDRYES, PARAISO
is_lateral_inspection
false