Wastewater/Activity/PacpInspection/1.0Jun 25, 2018, 03:34 PM
Date
06/25/2018
W/O
0706884
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P17726
Time
8:34 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7738
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
MANHATTAN BEACH
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
20180622DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
30 0025
Downstream MH
30 0024
Dir. of Survey
Downstream
Length Surveyed
397.6 ft.
Total Length
397.6 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 30 0025 to 30 0024
MH: 30 0025MH: 30 0024downstream0 ft. AMH - Upstream Manhole, Survey Begins - 8:36 AM0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 50% MAG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start36 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 4"104.4 ft. MGP - General Photograph201.3 ft. MGP - General Photograph310.8 ft. MGP - General Photograph394.4 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 50% MAG394.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish394.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish394.4 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish397.6 ft. AMH - Downstream Manhole, Survey Ends - 9:10 AM397.6 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach397.6 ft. MGO - General Observation - Grease Throughout The Reach (5%)

Observation photos (7)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 50% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 50% MAG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    104.4 ft. - General Photograph

  • General Photograph

    201.3 ft. - General Photograph

  • General Photograph

    310.8 ft. - General Photograph

Observations (18)

DistanceCodeObservation
0AMH8:36 AM
36TFA
104.4MGP
394.4SZ50% MAG
0MWM
394.4SAP
2SAP
2SRV
310.8MGP
0MWL
394.4SSS
201.3MGP
2SZ50% MAG
394.4SRV
397.6AMH9:10 AM
397.6MGOPeeling & Flaking Throughout The Reach
397.6MGOGrease Throughout The Reach (5%)
2SSS

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-06-25T08:34:27-07:00
documentation
FRANKLIN, IGNACIO, VENDRYES, PARAISO
is_lateral_inspection
false