Wastewater/Activity/PacpInspection/1.0Jun 22, 2018, 07:00 PM
  • 30 0018A_30 0017_6222018_120312.mp4

Date
06/22/2018
W/O
0706884
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P17720
Time
12:00 PM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7737
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
MANHATTAN BEACH
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
20180622DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
30 0018A
Downstream MH
30 0018
Dir. of Survey
Downstream
Length Surveyed
263 ft.
Total Length
263 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 30 0018A to 30 0018
MH: 30 0018AMH: 30 0018downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:01 PM0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 80% MAG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start29.3 ft. MGP - General Photograph76.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN114.4 ft. MGP - General Photograph185.3 ft. MGP - General Photograph211.1 ft. MGP - General Photograph211.1 ft. MGP - General Photograph258.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish258.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish258.4 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish258.5 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 80% MAG262 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active262 ft. MGO - General Observation - DROP CONN @ MH 3 O'CLOCK/ACTIVE262.4 ft. MGO - General Observation - Grease Throughout The Reach (5%)262.4 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach263 ft. AMH - Downstream Manhole, Survey Ends - 12:21 PM

Observation photos (8)

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 80% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 80% MAG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    29.3 ft. - General Photograph

  • Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN

    76.5 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN

  • General Photograph

    114.4 ft. - General Photograph

  • General Photograph

    185.3 ft. - General Photograph

  • General Photograph

    211.1 ft. - General Photograph

Observations (22)

DistanceCodeObservation
262MGOConn. @ Mh, 3 O' Clock. Active
2SZ80% MAG
2SSS
263AMH12:21 PM
258.4SAP
262MGODROP CONN @ MH 3 O'CLOCK/ACTIVE
0MWM
258.4SSS
211.1MGP
76.5TFOPEN
29.3MGP
0AMH12:01 PM
2SRV
258.5SZ80% MAG
258.4SRV
262.4MGOGrease Throughout The Reach (5%)
114.4MGP
0MWL
211.1MGP
2SAP
185.3MGP
262.4MGOPeeling & Flaking Throughout The Reach

Properties (6)

additional_info
ON SCREEN DISPLAY HAS THE WRONG REACH ON IT. THE ACTUAL REACH IS MH 0018A TO MH 0018
custom_field_two
3
customer
LACSD
datetime
2018-06-22T12:00:00-07:00
documentation
FRANKLIN, IGNACIO, VENDRYES
is_lateral_inspection
false