Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 22, 2018, 06:01 PM
  • 30 0020_30 0019_6222018_113210.mp4

Date
06/22/2018
W/O
0706884
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P17721
Time
11:01 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7737
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
MANHATTAN BEACH
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
20180622DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
30 0020
Downstream MH
30 0019
Dir. of Survey
Downstream
Length Surveyed
343.4 ft.
Total Length
343.4 ft.
Structural Index
3
Structural Quick
5132
Structural Rating
13
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
13
Pipe schematic from manhole 30 0020 to 30 0019
MH: 30 0020MH: 30 0019downstream0 ft. AMH - Upstream Manhole, Survey Begins - 11:03 AM0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start77.3 ft. MGP - General Photograph77.8 ft. MGP - General Photograph200.6 ft. MGP - General Photograph259.4 ft. MGP - General Photograph259.4 ft. MGP - General Photograph309 ft. MGP - General Photograph339.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish339.7 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 60% MAG339.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish339.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish339.9 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish343.4 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)343.4 ft. AMH - Downstream Manhole, Survey Ends - 11:48 AM343.4 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach

Observation photos (11)

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    77.3 ft. - General Photograph

  • General Photograph

    77.8 ft. - General Photograph

  • General Photograph

    200.6 ft. - General Photograph

  • General Photograph

    259.4 ft. - General Photograph

  • General Photograph

    259.4 ft. - General Photograph

  • General Photograph

    309 ft. - General Photograph

Observations (22)

DistanceCodeObservation
2SRV
0AMH11:03 AM
77.3MGP
2SAV
259.4MGP
339.9SRV
200.6MGP
0MWL
2SZ60% MAG
339.8SAP
2SSS
339.7SSS
2SAP
259.4MGP
339.7SZ60% MAG
309MGP
77.8MGP
343.4MGOGREASE THROUGHOUT THE REACH (5%)
343.4AMH11:48 AM
0MWM
343.4MGOPeeling & Flaking Throughout The Reach
339.7SAV

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2018-06-22T11:01:35-07:00
documentation
FRANKLIN, IGNACIO, VENDRYES
is_lateral_inspection
false