Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2021, 09:15 AM
  • 05 1669_05 1668_04012021_022645.mp4

Date
04/01/2021
W/O
886227
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00539
PipeID
P06893
Time
2:15 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8719
Sewer Name
05 WEST TORRANCE TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
32
Purpose
Routine Assessment
Project
WO_886227_TV05132_APR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
12 in.
Upstream MH
05 1668
Downstream MH
05 1669
Dir. of Survey
Upstream
Length Surveyed
290.5 ft.
Total Length
290.5 ft.
Structural Index
3
Structural Quick
3K2J
Structural Rating
288
O&M Index
2
O&M Quick
312J
O&M Rating
117
Overall Index
2
Overall Quick
Overall Rating
405
Pipe schematic from manhole 05 1668 to 05 1669
MH: 05 1668MH: 05 1669upstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 16690 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish7.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"60 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"108.6 ft. RMC - Roots Medium Connection, at 12 o'clock, 15 %, within 8 inches of joint: NO108.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - 15% ROOTS-LATERAL/OPEN160.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - 5% ROOTS-LATERAL/OPEN204.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"247.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN288.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start288.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start288.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start290.5 ft. MWM - Water Mark, 30 %of cross sectional area290.5 ft. AMH - Downstream Manhole, Survey Begins - 05 1668290.5 ft. MWL - Water Level, 25 %of cross sectional area

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
283.2TFC
288SSS
43.1TFOPEN
290.5AMH05 1669
130.1TF5% ROOTS-LATERAL/OPEN
288DAGS
290.5CM
0MWM
86.4TFA
0AMH05 1668
2SSS
181.9RMC
181.9TF15% ROOTS-LATERAL/OPEN
2DAGS
230.5TFA
2CM
0MWL

Properties (7)

additional_info
630074033121204
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-04-01T02:15:02-07:00
documentation
PROPIPE
is_lateral_inspection
false