Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2021, 09:03 AM
  • 05 1668_05 1667_04012021_021429.mp4

Date
04/01/2021
W/O
886227
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00539
PipeID
P06892
Time
2:03 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8719
Sewer Name
05 WEST TORRANCE TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
32
Purpose
Routine Assessment
Project
WO_886227_TV05132_APR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
12 in.
Upstream MH
05 1667
Downstream MH
05 1668
Dir. of Survey
Upstream
Length Surveyed
275.2 ft.
Total Length
275.2 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
273
O&M Index
2
O&M Quick
2J00
O&M Rating
108
Overall Index
2
Overall Quick
Overall Rating
381
Pipe schematic from manhole 05 1667 to 05 1668
MH: 05 1667MH: 05 1668upstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 16680 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish8.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN72.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN97.9 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"112.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN169 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"220.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN264 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN273.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start273.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start273.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start275.2 ft. AMH - Downstream Manhole, Survey Begins - 05 1667275.2 ft. MWL - Water Level, 25 %of cross sectional area275.2 ft. MWM - Water Mark, 30 %of cross sectional area

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    177.3 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

Observations (17)

DistanceCodeObservation
202.6TFOPEN
106.2TFC
54.8TFOPEN
162.4TFOPEN
273DAGS
177.3TBA
0AMH05 1667
2SSS
2DAGS
0MWL
275.2AMH05 1668
266.4TFOPEN
11.2TFOPEN
273SSS
0MWM
2CM
275.2CM

Properties (7)

additional_info
630074033121204
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-04-01T02:03:36-07:00
documentation
PROPIPE
is_lateral_inspection
false