Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2021, 07:18 AM
  • 05 1665_05 1664_04012021_003132.mp4

Date
04/01/2021
W/O
886227
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00539
PipeID
P06889
Time
12:18 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8719
Sewer Name
05 WEST TORRANCE TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
33
Purpose
Routine Assessment
Project
WO_886227_TV05132_APR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
12 in.
Upstream MH
05 1665
Downstream MH
05 1664
Dir. of Survey
Downstream
Length Surveyed
276 ft.
Total Length
276 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
276
O&M Index
2
O&M Quick
2J00
O&M Rating
108
Overall Index
2
Overall Quick
Overall Rating
384
Pipe schematic from manhole 05 1665 to 05 1664
MH: 05 1665MH: 05 1664downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 16650 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.2 ft. CM - Crack Multiple, from 10 to 04 o'clock, within 8 inches of joint: YES41 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"92.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"144.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"195.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN231.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"273 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish273 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish276 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ ACTIVE276 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish276 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE276 ft. AMH - Downstream Manhole, Survey Ends - 05 1664

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 10 to 04 o'clock, within 8 inches of joint: YES

    3.2 ft. - Crack Multiple, from 10 to 04 o'clock, within 8 inches of joint: YES

Observations (18)

DistanceCodeObservation
0AMH05 1665
2CM
276MGOCONN @ MH 3 O'CLOCK/ ACTIVE
0MWM
276CM
3.2CM
144.1TFC
195.8TFOPEN
92.3TF
273SSS
2SSS
276MGOCONN @ MH 9 O'CLOCK/ACTIVE
0MWL
2DAGS
273DAGS
276AMH05 1664
41TF
231.2TFC

Properties (7)

additional_info
630074033121204
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-04-01T00:18:29-07:00
documentation
PROPIPE
is_lateral_inspection
false