Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2021, 08:07 AM
  • 05 1662_05 1661_04012021_011640.mp4

Date
04/01/2021
W/O
886227
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00539
PipeID
P06886
Time
1:07 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8719
Sewer Name
05 WEST TORRANCE TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
33
Purpose
Routine Assessment
Project
WO_886227_TV05132_APR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
12 in.
Upstream MH
05 1662
Downstream MH
05 1661
Dir. of Survey
Downstream
Length Surveyed
275.5 ft.
Total Length
275.5 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
273
O&M Index
2
O&M Quick
2J00
O&M Rating
108
Overall Index
2
Overall Quick
Overall Rating
381
Pipe schematic from manhole 05 1662 to 05 1661
MH: 05 1662MH: 05 1661downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 16620 ft. MWL - Water Level, 20 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start38.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"91.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"139.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"190.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN243.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"273 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish273 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish275.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish275.5 ft. AMH - Downstream Manhole, Survey Ends - 05 1661275.5 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
38.8TFC
243.2TFC
190.9TFOPEN
273DAGS
273SSS
275.5CM
2CM
2SSS
0MWM
275.5AMH05 1661
139.2TFC
0AMH05 1662
2DAGS
275.5MGOCONN @ MH 3 O'CLOCK/ACTIVE
91.1TFA
0MWL

Properties (7)

additional_info
630074033121204
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-04-01T01:07:02-07:00
documentation
PROPIPE
is_lateral_inspection
false