Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 20, 2021, 08:47 AM
  • 15 0345A_15 0345_04202021_015503.mp4

Date
04/20/2021
W/O
886343
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12272
Time
1:47 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8782
Sewer Name
15 BALDWIN PARK TRUNK
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
WO_886343_TV15016_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0345A
Downstream MH
15 0345
Dir. of Survey
Downstream
Length Surveyed
115.2 ft.
Total Length
115.2 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
110
O&M Index
2
O&M Quick
412C
O&M Rating
48
Overall Index
2
Overall Quick
Overall Rating
158
Pipe schematic from manhole 15 0345A to 15 0345
MH: 15 0345AMH: 15 0345downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - 15 0345A0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start14.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"38.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"82.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"91 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"113.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish113.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish113.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish113.8 ft. MGO - General Observation - COCKROACHES IN MANHOLE115.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0345

Observation photos (4)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    113.8 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
113.8SAP
0MGOCOCKROACHES IN MANHOLE
113.8SSS
0AMH15 0345A
91TFA
38.1TFA
0MWM
113.8DAGS
0MWL
82.6TFA
115.2AMH15 0345
14.5TFA
113.8MGOCOCKROACHES IN MANHOLE
2SSS
0MGOCONNECTION AT MH 9 O'CLOCK
2DAGS
2SAP

Properties (7)

additional_info
630069041921201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-04-20T01:47:04-07:00
documentation
PRO PIPE
is_lateral_inspection
false