30 0037_30 0036_5102021_014853.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
2 ft. - General Observation - 98% MAG COAT START
3.7 ft. - Surface Reinforcement Corroded, from 11 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR UNDER MAG COAT
24.7 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
105.6 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
109.6 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - PEELED CONCRETE FROM PIPE
| Distance | Code | Observation |
|---|---|---|
| 322.2 | DSZ | ROCKS SLUDGE |
| 322.8 | AMH | 2:00AM |
| 322.2 | SAM | SEVERE AGG |
| 109.6 | DSZ | PEELED CONCRETE FROM PIPE |
| 3.7 | SRC | CIRCUM REBAR UNDER MAG COAT |
| 322.2 | MGO | 98% MAG COAT FINISH |
| 0 | MWM | — |
| 322.2 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 0 | MWL | — |
| 322.2 | SSS | BLISTERING PEELING CONCRETE |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 2 | MGO | 98% MAG COAT START |
| 24.7 | SAM | SEVERE AGG |
| 105.6 | SAM | SEVERE AGG |
| 16.7 | DSZ | ROCKS SLUDGE |
| 156 | DSZ | PEELED CONCRETE FROM PIPE |
| 0 | AMH | 1:35AM |