Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 10, 2021, 07:25 AM
  • 30 0038_30 0037_5102021_010217.mp4

Date
05/10/2021
W/O
0886345
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00878
PipeID
P17741
Time
12:25 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1801
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
05
Purpose
Capital Improvement Program Assesment
Project
20210504MDM_SOUTH_BAY_CITIED_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
30 0038
Downstream MH
30 0037
Dir. of Survey
Downstream
Length Surveyed
333.8 ft.
Total Length
333.8 ft.
Structural Index
4
Structural Quick
5144
Structural Rating
23
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
4
Overall Quick
Overall Rating
25
Pipe schematic from manhole 30 0038 to 30 0037
MH: 30 0038MH: 30 0037downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:45AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - 99% MAG COAT START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE42.2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG51.4 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG68 ft. SRC - Surface Reinforcement Corroded, at 02 o'clock, within 8 inches of joint: NO - LONG REBAR72.5 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE ROCKS75.4 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG217.8 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG251.7 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE ROCKS333.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE333.3 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG MISSING333.3 ft. MGO - General Observation - 98% MAG COAT FINISH333.8 ft. AMH - Downstream Manhole, Survey Ends - 1:15AM

Observation photos (9)

  • General Observation - 99% MAG COAT START

    0 ft. - General Observation - 99% MAG COAT START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    42.2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    51.4 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Reinforcement Corroded, at 02 o'clock, within 8 inches of joint: NO - LONG REBAR

    68 ft. - Surface Reinforcement Corroded, at 02 o'clock, within 8 inches of joint: NO - LONG REBAR

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - SLUDGE ROCKS

    72.5 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE ROCKS

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    75.4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    217.8 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Finish - SLUDGE ROCKS

    251.7 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE ROCKS

Observations (16)

DistanceCodeObservation
68SRCLONG REBAR
75.4SAMSEVERE AGG
42.2SAMSEVERE AGG
333.3SSSBLISTERING PEELING CONCRETE
333.3SAMSEVERE AGG MISSING
217.8SAMSEVERE AGG
251.7DSZSLUDGE ROCKS
0MWL
0AMH12:45AM
333.3MGO98% MAG COAT FINISH
0MWM
0MGO99% MAG COAT START
51.4SAMSEVERE AGG
2SSSBLISTERING PEELING CONCRETE
333.8AMH1:15AM
72.5DSZSLUDGE ROCKS

Properties (6)

custom_field_three
LONG REBAR CORRODED- 98% MAG COAT
custom_field_two
2
customer
LACSD
datetime
2021-05-10T00:25:36-07:00
documentation
MARTIN,OLIVER 111,RUVALCABA,BARR
is_lateral_inspection
false